Lean thinking is about reducing waste. It defines three types of waste: Muri (Overburden, e.g. unreasonable quantities of production) Muda (Wastefulness, e.g. defects in production) Mura (Unevenness, e.g. uneven flow in production)

Essentially, this means we have seven principles (Toyota, 2001) that embody lean, aiming to reduce waste and increase production efficiency:

  • Eliminate waste (Muda)
  • Amplify learning (MVP)
  • Lower inventory with JIT (Kanban, Muri)
  • Deliver fast by maximising flow (Kanban)
  • Utilise skills (MVP)
  • Build product integrity (Muda)
  • See the whole process (Mura, Muri)

Lean is characterised by a pull-based system (acting on demand) - “we build what we need when it is needed”. This is Kanban, characterised by just-in-time (JIT) manufacturing.

We also use the Minimum Viable Product (MVP) to embody lean. This ensures customer demand is at the heart of the manufacturing process.

These principles go hand in hand with the five pillars of lean:

  • Identify value
  • Map the value stream (life cycle of a product; eliminate muda)
  • Create flow
  • Establish pull (JIT)
  • Seek perfection (continuous improvement)

Toyota’s Principles

Toyota, the creator of lean, created a lean house to represent their lean processes. The aim is high quality, low cost, shortest lead time

It does this with two major pillars: JIT and Jidoka (Intelligent Automation)

Jidoka is the principle that faults stop a workflow and a countermeasure is put in place

Supporting these pillars is three key principles:

  • Heijunka - level production to reduce waste
  • Standardised Work
  • Continuous Improvement